Engineering & construction
Dendermonde 2022 • Back to references
![](https://dranco.be/wp-content/uploads/2022/04/dendermonde-april-2022-website-referenties.jpg)
Location | Dendermonde, Belgium |
---|---|
Plant capacity | 45.000 ton/year |
Digestion capacity | 30.000 ton/year |
Waste type | Biowaste/green waste/wood/berm cuttings |
Reactor volume | 2.865 m³ |
Start-up | 2022 |
Client | VERKO |
OWS has been chosen to construct/modernize the waste treatment project in Dendermonde (Belgium).
The plant will treat 45.000 tons/year of source separate collected biowaste, green waste, roadside cuttings & prunings. The works include the construction of a new receiving hall, pretreatment, a DRANCO digester, modernization of the existing tunnelcomposting, heat utilisation, air treatment, maturation, CHP’s and gas upgrading.