Engineering & construction
Salzburg 1993 • Back to references
![](https://dranco.be/wp-content/uploads/2013/02/DRANCO-installatie-Salzburgo1.jpg)
Location | Bergheim-Siggerwiesen, Austria (near Salzburg) |
---|---|
Plant capacity | 20.000 tons of biowaste per year |
Waste type | Biowaste |
Reactor volume | 1.800m³ |
Start-up | 1993 |
Client | Salzburger Abfallbeseitigung Gesellschaft (SAB) |