Vitoria

  • Digestion capacity: 20.000 ton/year
  • Feedstock: MSW
  • Output: Biogas, electricity
  • Startup: 2006
  • Client: BIOCOMPOST DE ÁLAVA UTE
  • Location: Spain
Vitoria overview

First in Basque Country.

The Vitoria-Gasteiz Urban Solid Waste Treatment Plant is a modern facility that converts organic municipal waste into biogas and electricity. Built by the City of Vitoria-Gasteiz and the Álava Provincial Council with EU Cohesion Fund support, it is the first plant of its kind in the Basque Country to valorize organic waste on an industrial scale. 

The plant processes up to 120,750 tonnes of raw waste per year, reducing landfill disposal by 50% while generating renewable energy. It uses advanced, fully automated methanization and composting technologies designed to be safe, efficient, and environmentally friendly. In addition to waste treatment, the facility promotes environmental education through an on-site learning center and guided observation areas.

Testimonials from our customers

During the engineering, construction, start-up and operation DRANCO has proven to be a reliable partner. The installation was started up in 2008 and is in operation in a very satisfied way.

Alfonso Cano Gomez - Plant Manager
UTE Alicante

View this project

"The collaboration with DRANCO proved very important to our team. Their system treats 300 tons of kitchen waste for us every day. This happens efficiently, reliably, and without the need for tank cleaning or maintenance. After three years, it’s still running like day one."

Kuang Qian
Deputy General Manager, Chongqing
Yuhuan Bioenergy Co., Ltd

View this project

"We are very pleased with how the installation runs and we're very happy with service provided by Dranco."

Devin Brosens
Operator IOK Beerse