"We are very pleased with how the installation runs and we're very happy with service provided by Dranco."
Devin Brosens
Operator IOK Beerse
Pioneering Biomethane Innovation in Belgium
Established in 2018, this facility was the first of its kind in Belgium to upgrade biomethane and inject it directly into the public gas grid. Operated by IOK Afvalbeheer, the plant processes up to 35.000 tonnes of biowaste annually, primarily consisting of source-separated organics like food and yard waste.
With a reactor volume of 2.775 m³, the site not only upgrades biomethane for grid injection but also utilizes it for local energy generation through a combined heat and power (CHP) system — contributing to both renewable energy production and regional sustainability.
Each year, the site produces sufficient biomethane to support close to 500 households (average Belgian household consumes about 1.400 m³ of methane per year for heating and cooking).