Hengelo

  • Digestion capacity: 50.000 tpy
  • Feedstock: Biowaste
  • Output: Electricity, heat
  • Startup: 2011
  • Client: Twence BV
  • Location: the Netherlands
Hengelo overview lucht
Hengelo reactor in opbouwvierkant

Quite the build.

Put together  in three large sections, the DRANCO reactor construction was quite the sight in Hengelo on a sunny summer Saturday in 2010. With a majestic crane, a total of 200 tons was lifted into place as the sections were carefully positioned.

The reactor vessel has a diameter of 15 meters and stands 30 meters high. The biogas produced in the digester is converted to electricity by gas engines. In doing so, Twence ensures optimal use of all the energy contained in the biogas. The remaining material from the digestion process is further processed in the existing composting facility to produce high‑quality compost.

 

Testimonials from our customers

During the engineering, construction, start-up and operation DRANCO has proven to be a reliable partner. The installation was started up in 2008 and is in operation in a very satisfied way.

Alfonso Cano Gomez - Plant Manager
UTE Alicante

View this project

"The collaboration with DRANCO proved very important to our team. Their system treats 300 tons of kitchen waste for us every day. This happens efficiently, reliably, and without the need for tank cleaning or maintenance. After three years, it’s still running like day one."

Kuang Qian
Deputy General Manager, Chongqing
Yuhuan Bioenergy Co., Ltd

View this project

"We are very pleased with how the installation runs and we're very happy with service provided by Dranco."

Devin Brosens
Operator IOK Beerse

View this project

Let’s make your project a success. 
Contact us to get started.

Contact