NÜSTEDT

  • Digestion capacity: 18.500 ton/year
  • Feedstock: Corn silage, grass & chicken manure
  • Startup: 2006
  • Output: Electricity, heat, soil improver
  • Client: Bioenergie Klosterbachtal
  • Location: Germany
Nustedt overzicht

From energy crops to energy.

Since about 20 years, local farmers and DRANCO are operating this DRANCO-FARM plant.

Commissioned in 2006, the Nüstedt installation was one of the first continuous dry‑digestion plants operating on energy crops in Europe, marking an important milestone for DRANCO technology. The plant operates with a vertical DRANCO‑FARM digester and can treat approximately 20,000 tons of energy crops and harvest residues per year

The Nüstedt installation generates around 1 MW of electrical power, contributing renewable energy to the local grid. Its continuous plug‑flow digestion system ensures stable operation with minimal maintenance inside the reactor thanks to the absence of internal mixing equipment. Digestate from the process can be further treated or applied as a soil improver, supporting circular agricultural practices. The plant showcases the advantages of DRANCO‑FARM technology, including compact design, high biogas yields, and strong operational reliability. Overall, the Nüstedt facility demonstrates how dry anaerobic digestion can efficiently transform crop residues into sustainable energy while supporting regional resource recovery. 

Watch this video to learn more: CLICK HERE

Nustedt vrachtwagen ok
Massabalans Nustedt

Testimonials from our customers

During the engineering, construction, start-up and operation DRANCO has proven to be a reliable partner. The installation was started up in 2008 and is in operation in a very satisfied way.

Alfonso Cano Gomez - Plant Manager
UTE Alicante

View this project

"The collaboration with DRANCO proved very important to our team. Their system treats 300 tons of kitchen waste for us every day. This happens efficiently, reliably, and without the need for tank cleaning or maintenance. After three years, it’s still running like day one."

Kuang Qian
Deputy General Manager, Chongqing
Yuhuan Bioenergy Co., Ltd

View this project

"We are very pleased with how the installation runs and we're very happy with service provided by Dranco."

Devin Brosens
Operator IOK Beerse

View this project

Let’s make your project a success. 
Contact us to get started.

Contact